• Home
  • CTST Program
  • Engineering
  • Resources
  • Blog
  • Contact
Logo of FDOT Tampa Bay Traffic SafetyLogo of FDOT Tampa Bay Traffic SafetyLogo of FDOT Tampa Bay Traffic SafetyLogo of FDOT Tampa Bay Traffic Safety
  • Home
  • CTST Program
    • CTST Meeting Calendar
    • CTST Presentation Archive
    • 2025 FDOT D7 CTST Spring Mega Meeting
    • Hillsborough CTST
      • Hillsborough CTST Events Calendar
    • Pasco CTST
    • Pinellas CTST
    • West Central CTST
    • Tampa Bay Area University CTST
  • Engineering
    • FDOT Active Projects
    • Safety Engineering
    • Access Management
    • Design Build Push Button (DBPB)
    • High Friction Surface Treatment Program (HFST)
    • Highway Safety Improvement Program (HSIP) ​
    • Design Safety Prompt List (PDF)
    • D7 Memorandums
  • Resources
    • FDOT District 7 Safety Newsletter
    • Recipes for the Road
  • Blog
  • Contact
✕

Design-Build Push Button Contract

July 19, 2021

Florida’s 2021 – 2025 Strategic Highway Safety Plan (SHSP)

July 20, 2021

Design-Build Push Button Contract

July 19, 2021

Florida’s 2021 – 2025 Strategic Highway Safety Plan (SHSP)

July 20, 2021

Florida Department of Transportation's Central Office and District Seven High Friction Surface Treatment Program (HFST)

Documents

  • High Friction Surface Treatment Program RSA (PPT)
  • High Friction Surface Treatment (HFST) Inspection and Installation Training for Florida DOT
  • FDOT High Friction Surface Treatment Guidlines (PDF)
  • FHA High Friction Surface Treatment (HFST) Quick Reference (PDF)
  • LATSA High Friction Surface Treatments‐Florida Practices and Safety Performance Analysis (PDF)

Questions?

Kelly Farabee, PE, PTOE, RSP2I

FDOT District 7
Traffic Safety Program Engineer
813.975.6254

Kelly.Farabee@dot.state.fl.us

© 2025 Tampa Bay Traffic Safety | All Rights Reserved | Site Maintained by Benesch